Pharma and life sciences
In pharma, a planning failure can interrupt a patient’s treatment. A model plans stock, production and cold chain with every rule built in.
- Free 30-minute call
- No commitment
- You own the code
Typical problems in pharma and life sciences.
An expired batch is destroyed while another product runs short. You check cleaning rules and temperature limits by hand, in three different spreadsheets.
Planning failures put patients at risk
A missed reorder leaves a hospital short of a product. Somewhere, a patient’s treatment has to wait.
Expiry risk
The forecast ignores shelf life. One batch expires on the shelf while the next product runs short.
Cold chain breaks
A shipment waits on a warm loading dock because the schedule ignored the temperature rules. You have to throw away the whole shipment.
Rules checked by hand
Everyone assumes the schedule follows the manufacturing rules. In practice, you check cleaning and changeover rules by hand.
In short: A pharma supply chain optimisation plans the stock, production and temperature-controlled transport (cold chain) of medicines in one model, with every quality rule built in. It sequences production around cleaning rules and holds stock with shelf life in mind.
When a planning error reaches the patient
A hospital pharmacy orders a product, and the distributor’s shelf is empty. Two aisles over, a batch of another product expires next week and will be destroyed. Both mistakes started months earlier, in a forecast that ignored shelf life. A stockout can interrupt a patient’s treatment, and an expired batch is money and medicine thrown away.
Production adds its own risk. On a production line that makes several products, three kinds of rules decide which product may follow which: cleaning rules, changeover rules and validation rules. Validation means proving that a process reliably makes the product as specified. Shipments have temperature limits and storage rules. You police all of this by hand, and every batch depends on you remembering every rule.
What changes when the rules come first
Today, you build the plan, then check it against the rules and fix every rule it violates. In our model, the rules are built in from the start, and cost is optimised inside them. You make and order only what will be used before it expires. The production sequence keeps every cleaning and changeover rule by itself.
You stop policing rules and start reviewing plans. Every decision the model makes can be audited, so you can show your quality team why it was made. You still get the lowest cost the rules allow.
Pharma supply chain optimisation starts with the rules
Medicines come with strict rules for how they’re made, stored and shipped. We write those rules into the model. In pharma production scheduling, cleaning, validation and changeover rules decide the sequence on a multi-product production line. Validation means proving that a process reliably makes the product to specification. Your demand forecast goes into the model with shelf life built in, and inventory optimisation sets how much to hold.
What your cold chain rules ask of transport planning
In a cold chain, a medicine stays cooled all the way from the plant to the pharmacy. Most cold chain pages talk about cool boxes and data loggers, the devices that record the temperature on the way. But your rules also affect how you plan transport. Each delivery route gets a risk assessment, and that assessment decides where temperature control is needed. Goods should wait as short a time as possible between two legs. And you have to measure where it gets too warm or too cold in a vehicle or store, in summer and in winter. That’s called temperature mapping.
These rules are tasks for route planning. In cold chain distribution optimisation, our model takes three things into account for each leg: its risk, the time the goods wait there, and the season. It also writes down why it chose each route. You get a plan and, for every route, the reasons from the risk assessment. Network design then decides where to hold stock, so the routes stay short and the goods stay cold.
How a project runs.
Each of the three phases ends with something you can check before we go any further.
-
Understand
We start with your operation. What do you plan, where does it go wrong, and what would a better week look like? Then we tell you straight whether optimisation can help, and sometimes the answer is no.
- A written assessment
- A clear go or no-go
-
Model
We write your decisions, goals and rules into a mathematical model, which is just a precise description of how your operation works. Then we run it on your own data. You see side by side what each plan costs and what it delivers, and pick the one that fits your priorities.
- A documented model
- Results on your own data
-
Implement
We test with your data and go through the results with your team. Once they trust it, we connect the model to your systems, so it runs every day without anyone stepping in by hand.
- Source code and documentation
- Training for your team
Common questions.
Something else? Ask us directly.
They ask you to check for every delivery route where the goods could get too warm or too cold. On those stretches, you need cooling or a temperature measurement. Store goods between two trips for as short a time as possible. And measure the temperatures along the route in summer and in winter. This is called temperature mapping. A routing model works with this information and records why it chose each route.
Your quality system decides on the product. Usually the goods are first put on hold until the quality team has checked the data from the temperature logger. Planning can’t undo an excursion, but it can make one less likely. Legs with long waits or summer heat get flagged in the risk assessment. The model then plans those stretches with shorter waits or with active cooling.
Yes. Cleaning and changeover rules become constraints on which product may follow which, and on how long cleaning takes. The model only builds sequences that keep them. Your quality team reviews the rule set once, and every plan after that follows it.
It depends on the problem, so we agree the timeline with you up front. Every project starts with a diagnostic, a short look at how you plan today. It shows which data, how much time and what budget a model for daily use needs. Only then do you decide.
No. We connect to your ERP, your warehouse management system or your planning spreadsheet. We build the model only for the planning that gives you trouble today. Your systems keep running as before.
Almost nobody’s data is clean. The diagnostic shows what the model needs and what’s missing. Then we build the model to cope with messy data.
Off-the-shelf tools are built for many companies at once, so they don’t know your special rules. We build a model that follows exactly your rules. Then we hand it over, and your team owns it.
Similar pages.
Tell us what you’re planning.
In a free 30-minute call with a specialist, you find out whether optimisation can help.
- Free, no commitment
- You talk to a specialist directly
- A clear go or no-go