Planning problems
Each use case starts with the problem the way you know it. We then show you what changes and how the model works. Filter by problem type, or open a category.
- Free 30-minute call
- No commitment
- You own the code
- Vehicle routing optimisation Shortest route, wrong plan.
- Real-time dispatch Your 7am route plan is out of date by 9am.
- Territory design Unbalanced territories overload some sales reps and leave others with too little to do, and nobody reaches their sales target.
- Last-mile route planning The last mile, from the depot to the front door, is the most expensive part of a delivery.
- Multi-depot routing With several depots, every routing decision hides a second question: which depot should serve this customer today?
- Pickup and delivery optimisation Every pickup has a delivery, and each has its own time window.
- Green routing and carbon minimisation Shorter routes aren’t always greener routes.
- Two-echelon routing City centres can’t take full-size trucks.
- Periodic vehicle routing Your regular customers don’t need a new route every day.
- Field technician routing Send the wrong technician, and you lose the travel time, the customer’s patience and the fix.
- Workforce shift scheduling You fill the rota by hand and hope you’ve kept every rule.
- Nurse scheduling You fix the rota after hours, and agency nurses cover the open shifts.
- Production scheduling A bad production schedule costs overtime, wasted changeovers and missed delivery dates.
- Crew scheduling No spreadsheet can hold every flight, crew licence and duty-time rule at once.
- Employee rostering Your rota covers every shift, but the same people always get the weekends.
- Job shop scheduling In a job shop, every order takes its own path, and each rush order means replanning by hand.
- Flow shop scheduling Every job takes the same path through your production line, and you set the order by feel.
- Batch scheduling and changeover minimisation Every changeover is lost production time.
- Exam and academic timetabling Fix one exam clash by hand, and three more can appear.
- Timetabling Move one course, and every student, lecturer and room tied to it moves too.
- Inventory optimisation Too much stock ties up cash, and too little loses sales.
- Safety stock and reorder point Your safety stock was calculated on assumptions that no longer fit.
- Replenishment planning Reorder rules fail on thousands of items, shifting lead times and supplier minimums.
- Supply chain network design Your warehouses and distribution centres were planned for the customers and volumes of years ago.
- Warehouse slotting and layout In a large warehouse, pickers spend much of their shift walking.
- Procurement and sourcing Awarding each line to the cheapest bid ignores freight, capacity and risk.
- Multi-site production planning When each plant plans alone, volume lands at costly sites and stock is held twice.
- Cutting stock and trim loss Every offcut you throw away is material you already paid for.
- Machine capacity planning Many plants find out a machine is short of hours only when it falls behind.
- Assortment and SKU rationalisation Many retailers carry more product lines than they need.
- Maintenance scheduling Unplanned downtime almost always costs more than planned maintenance.
- Markdown and pricing optimisation Mark down too early and you give away margin, too late and the stock won’t clear.
- Flexible job shop scheduling Three machines can run the operation, so you choose machine and start time.
- Bid and RFP analysis Bid too high and you lose the contract, bid too low and you lose margin.
- Network simulation and what-if Most network decisions rest on a spreadsheet comparing two cost totals.
- Perishable inventory optimisation Order too little fresh stock and the shelf runs empty.
- Resource allocation and assignment You have more work than people, machines and budget.
- Staff-to-task matching The best person for a task isn’t always the one who happens to be free.
- Facility location optimisation Where you put your sites decides what you pay for the next ten years.
- Equipment and asset assignment Every idle hour of your equipment costs money and earns nothing.
- Workforce allocation across sites Each site plans its own rota, and agency staff cover the shifts it can’t fill itself.
- Capacity planning and bottleneck analysis Every operation has a bottleneck.
- Project and task scheduling Your Gantt chart looks fine until two projects need the same crew.
- Scenario planning and simulation On a spreadsheet, a site closure looks simple until the contracts are signed.
- Live operations model You usually learn whether a change works after you make it.
- Meeting and room scheduling Finding a time by hand that works for twelve people across three sites often takes days.
- Training course scheduling By hand, it takes weeks to give every course the right trainer, room and date.
- Multi-objective resource planning The cheapest plan isn’t always the best one.
- Portfolio optimisation You can’t fund every project.
- Risk and stochastic optimisation A plan built on one forecast fails when the forecast is wrong.
Tell us what you’re planning.
In a free 30-minute call with a specialist, you find out whether optimisation can help.
- Free, no commitment
- You talk to a specialist directly
- A clear go or no-go