Every idle hour of your equipment costs money and earns nothing. Our model puts the right unit on the right job, so you move fewer units between sites for nothing.

  • Free 30-minute call
  • No commitment
  • You own the code
Typical industries
Manufacturing, Construction and project-based
Problem type
Resource planning
You receive
A documented model, run on your data

In short: An equipment assignment optimisation decides which machine, vehicle or tool goes to which job, and when. It accounts for availability, travel between sites and future bookings. That way your equipment stands idle less often and is moved between sites for nothing less often.

The problem

A crane waits on standby between lifts. A scanner gets wheeled back to the storeroom before the next patient. Across town, a truck drives home with an empty deck. None of that time earns anything, and all of that equipment keeps losing value. Together, those hours are a cost that nobody decided to pay.

For most operations, equipment is the most expensive thing they own. Yet most of the time, habit decides which machine does which job. The job goes to the nearest machine, the one everyone reaches for, or whichever unit happens to be free.

Why “nearest free unit” fails

The usual tools are a whiteboard, a radio and a foreman. The nearest free unit goes to the next call. Then it turns out the crane that just left was the one the next job needed. Or the scanner booked to one ward was the only one qualified for the case across the corridor.

Each decision only looks at the unit in front of you. You don’t see what the decision does to the next jobs. Say you move one job earlier. Then a machine that was free is suddenly planned for two jobs at the same time, and one of them has to wait. Or you send a truck somewhere else. Then it arrives too late at its next customer. The site looks busy while units elsewhere have no work, and you pay to move units that never needed to move.

What changes

Today, the foreman sends the nearest free unit to the next call over the radio. Our model plans the whole fleet’s day before the first job starts. Each job gets a unit of the right type that’s free and close by. The foreman still runs the site and changes an assignment when a unit breaks down. If a crane is booked for two jobs at the same time, you see it in the morning, before it leaves.

What you get

Equipment assignment optimisation treats the question “which unit does which job?” as a matching problem: each job gets one unit. Fixed limits apply. The unit must be free, of the right type and able to get there in time. You get the right unit on each job, with the least idle time and movement.

You see the result in three figures. Utilisation is the share of time a unit works: 6 of 8 hours is 75 per cent. Idle time is the rest. Repositioning cost is the money spent moving units between sites. We build the model on your fleet, your moving costs and the times each unit is free. We test it on your own records before you use it for planning.

  • A model written around your own equipment and asset assignment rules.
  • Results measured in the numbers you already track.
  • It slots into how you already work, and you can check every answer it gives.

Which utilisation are you optimising?

Ask three people for your utilisation figure and you may get three numbers. Rental firms measure two kinds. Time utilisation is the share of available days a unit is out working. Dollar, or financial, utilisation is a year’s revenue from a unit divided by what it cost. Say a $500,000 unit earns $250,000 a year. That’s 50 per cent dollar utilisation.

The two measures work against each other: when one rises, the other can fall. Keep every cheap compactor busy and time utilisation looks great, while the expensive crane has no work. So before we build anything, we ask which of the two numbers you go by. Asset utilisation optimisation can aim at hours worked or at return on capital, meaning what each dollar spent on a unit earns back. It can also aim at a blend of both. Aim at hours, and the model puts the many cheap units to work first. Aim at return on capital, and the expensive crane comes first.

Your records decide how far you can go. A 2025 thesis at the Vienna University of Technology (TU Wien) studied an Austrian building contractor. Its equipment data was spread across four places. Some was in the ERP system, the software for orders, purchasing and accounts. Some came from telematics, the data machines report by themselves. The rest was in spreadsheets and on paper. The author found that this patchwork led to planning errors and poor utilisation. So our first step is to bring the records into one place. The model needs them there, and you then see every unit at a glance.

How it works

We write your resources, the work they have to cover and your rules into one model. You get a plan that says which resource does what and when. It’s the plan that fits your goals best, such as the lowest cost or the shortest waiting time. Every rule is kept at the same time, and that’s the part a spreadsheet can’t do.

Asset assignment as a matching problem

The core is the assignment problem, a classic optimisation task. It pairs units with jobs so that the total cost is as low as possible. Each unit has a type, a location, a window of time when it’s free and a cost to move. Each job needs a certain type of unit, at a certain site and time. In practice, though, one unit rarely does just one job. A crane serves one lift after another, and infusion pumps get moved between wards all day.

You match on four things. Type comes first, so a loader job gets a loader. Availability means the machine is free when the job starts. Third comes repositioning cost: a unit already on site is chosen before a unit that is two hours away. Last comes utilisation over the whole planning period: every unit should work as much as there are jobs for it.

Availability, travel and multi-period planning

Availability windows are the times a unit is free. They stop you from assigning a unit that’s out on a job, in maintenance or already booked. For each unit, the model knows its type and the times it is free. It also counts what each move between sites costs. So nearby units take the work, and you don’t move units from site to site for nothing.

Multi-period assignment plans several shifts in a row, not one at a time. What you commit this morning changes what’s free this afternoon. Plan one shift at a time and a unit soon ends up on one side of town while its next job waits on the other. One model decides which unit does which job, in what order and how far each unit moves.

One model for the whole fleet

We solve the whole assignment as one optimisation. Type, availability, travel and utilisation become constraints and objectives. A constraint is a rule the plan must keep. An objective is a goal the model pushes as far as it can, such as the least idle time. We write the assignment method for your fleet, your moving costs and your units’ calendars. We use the same method as for resource allocation. Here the resources are machines, devices and vehicles.

Where it matters most

Construction is the clearest example. You hire cranes, excavators and specialist machines at daily rates and move them between sites. Every idle day reduces your margin, the profit left after costs. With mixed vehicle fleets, you have the same task on the road. Vans, trucks and articulated lorries get matched to deliveries by how much they carry, how far they can drive and where they are.

Hospitals move scanners, infusion pumps and mobile imaging devices between wards and sites. The patients there can’t wait. In manufacturing the same problem assigns machines to jobs and tooling to production lines. Asset allocation software built on a model of your fleet shows you where the capacity you paid for goes unused.

Common questions.

Something else? Ask us directly.

Time utilisation is the share of available days a unit is out working. Dollar utilisation is a year’s revenue from the unit divided by what it cost. A cheap unit can score high on time and low on money, and an expensive one the other way round. Before we optimise, we ask which one you manage, because each puts different units to work first.

Compare two plans for your own fleet. First we calculate the year with the units you have today. Then we calculate it with one unit fewer. For the jobs that unit would have done, we add a hired unit at the rates you pay. If the smaller fleet costs less across a normal year, the idle unit is costing you money. We test it on several years of jobs before you sell a machine.

First, a unit list with type and capabilities. Second, a year of job records with site, date and duration. Third, a rough cost per kilometre for moving a unit between sites. Operating hours from telematics help. Telematics is the data the machines report themselves. But a first model works without it. A TU Wien thesis found one contractor’s data split across ERP, telematics, spreadsheets and paper. Pulling it together is the first step either way.

Yes. When a unit breaks down, you mark it unavailable and the model re-plans the rest of the day. It keeps the jobs already under way and moves as little as possible. You see the proposed changes and confirm them.

Sometimes it can, and if that’s the case, we’ll tell you. Standard software is built for an average operation, though. Yours runs on its own rules: your contracts, your exceptions, the things you know by heart. A custom model writes those rules in, and that’s where the better plan comes from.

You don’t need either to start. We build the model from the data you’ve already got, even if it lives in three spreadsheets and one person’s head. You get a system you run yourself. We train your team until they no longer need us.

You see a first result with the prototype, before you commit to anything bigger. We start with a free 30-minute call about your operation and the model that would fit it. Then we build a working prototype and run it on your numbers.